Gantt
英[ˈɡænt]
美[gænt]
双语例句
- 1. Click to rename the selected gantt chart.
- 单击此处可重命名所选甘特图。
youdao
- 2. Process leads to Hate (and meetings, and Gantt charts)
- 进程(改变)导致不喜欢(会议或者甘特图)
youdao
- 3. The Gantt chart in Part 1 outlined our Phase 1 work packages.
- 第1部分中的甘特图描述了我们第1阶段的工作任务包。
youdao
- 4. We didn't have a Gantt chart, because we didn't need one.
- 我们没有绘制甘特图,因为我们并不需要它。
youdao
- 5. In the schedule control, the main tools are Gantt chart and check list.
- 在进度控制方面,使用的主要工具是甘特图和核查清单。
youdao
- 6. Gantt charts show the sequence of activities and how long each should take.
- 甘特图显示活动顺序多久,每个人都应该采用。
youdao
- 7. Gantt chart is an effective tool for planning and controlling project schedule.
- 甘特图是工程项目进行工期计划和控制的有效工具。
youdao
- 8. Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.
- 使用甘特图、PERT图、策划树等工具策划项目。
youdao
- 9. Figure 2: Gantt chart based on dependencies between architecturally significant elements.
- 图2:基于架构设计中重要元素之间依赖性的甘特图。
youdao
- 10. A modified Gantt chart that schedules capacity by entire department or specific resources.
- 一种改进的甘特图,它具有能列出全部部门或者是特定的资源的能力。
youdao
- 11. The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.
- 甘特图形的优势是其简洁,便于准备和使用,且成本低。
youdao
- 12. You can imagine them building up the Gantt chart as they go, filling in more and more detail.
- 您可以想象他们这么做实际上是在构建一幅越来越详细的甘特图(Gantt chart)。
youdao
- 13. Give the arithmetic examples of flow shop and job shop, and show their schedule Gantt pictures.
- 针对流水调度和作业调度给出了算法实例,并且绘制出了流水和作业调度的甘特图。
youdao
- 14. When you measure success in features delivered, your guiding star is the carefully crafted Gantt chart.
- 当你以交付功能的方式度量成功时,绘制精美的甘特图就是你的指路明灯。
youdao
- 15. Plans are always documents, don't fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.
- 计划通常是文件。不要陷入陷阱,例如,认为一张甘特横道图是一个计划,它仅仅是一张进度表而已。
youdao
- 16. In addition, they typically measure progress using Gantt charts that indicate the project is 33 percent complete, 66 percent complete, and so forth.
- 另外,他们通常用甘特图来衡量整个项目的进程,在甘特图上会显示已经完成了33%尚未完成66%,诸如此类。
youdao
- 17. As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
- 作为一种先进的方法,网络计划技术在施工管理中应与横道图结合使用,在招投标工作中更应很好地运用。
youdao
- 18. The principle of network planning technique and network chart drawing method are illustrated and compared with Gantt chart analysis method in this paper.
- 介绍了网络计划技术的原理和网络图的绘制,并与传统的甘特图分析方法进行了比较。
youdao
- 19. The traditional project management tool, such as PERT and Gantt chart are used in activities sequencing. Those activities are independent with each other.
- 传统的项目管理工具,如PERT图、甘特图,都能清楚地显示各个作业之间的相互关系,也适用于合理安排作业执行的顺序。
youdao
- 20. Then the mathematical description of operation relativity is given systematically from algebraic specification, Gantt chart expression and type conversion.
- 进一步提出在经典的车间作业计划析取图模型中,通过加入相关弧以表示工序的相关性。
youdao
- 21. Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
- 作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
youdao
- 22. SVG chart components can produce varietious different kinds of charts, such as pie, bar, curve, gantt etc, by reading varietious data sources like common database, XML.
- SVG图表组件通过读取多种数据源,如常见的数据库、XML文档,可以生成各种样式的图表,如饼图、柱状图、曲线图、甘特图等。
youdao
- 23. To set a particular Gantt bar to be drawn over another bar, double-click an open area on the Gantt Chart and move the foreground bar below the background bar in the list.
- 如果要将指定条形图绘在其他条形图之上,请双击“甘特图”上打开的区域然后在列表中将前景条形图移动到背景条形图的下面。
youdao
- 24. Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
- 有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
youdao
- 25. Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
- 有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
youdao