英语单词

socketed的中文翻译

socketed

英[ˈsɒkɪt] 美[ˈsɑːkɪt]
  • n. (电源)插座;(电器)插口,插孔;(人体的)窝,槽;(高尔夫插球杆的)棒头承口;(用以插入某物使其转动的)承窝,轴孔
  • v. 插入,使装入插座

双语例句


1. Do you think Socketed Items will have an impact?
你认为插槽的物品有效果么?

youdao

2. Can a socketed item have an enchantment on it in addition to gems?
一个有镶嵌槽但已经有附魔的货物也许再镶嵌么?

youdao

3. Method of capacity of socketed piles are determined to bring together.
归纳总结了确定嵌岩灌注桩的承载力方法。

youdao

4. Can a socketed item have an enchantment on it in addition to gems? Yes.
一个有镶嵌槽但已经有附魔的物品可以再镶嵌么?

youdao

5. They require a certain number of socketed gems on the character to be turned on.
他们需要固定数目和组合的宝石组合在一起。

youdao

6. Flux_Diii. net: i saw some socketed items but never found anything to socket them with.
我看到一些打孔物品,但却没有找到任何可以镶进去的东西。

youdao

7. So, the lateral bearing property of rock-socketed piles has been concerned by engineering and academia.
因此,嵌岩桩的水平承载性状一直是工程和学术界比较关注的问题。

youdao

8. The refined load-transfer method was used to analyze the settlement of socketed pile on soft rock foundation.
本文利用剪切位移法分析计算软质基岩上的嵌岩桩沉降变形。

youdao

9. It is shown that the shape of curves is related to the rock weathering of bearing strata and rock-socketed depth.
结果表明抗拔桩的曲线形状与持力层岩石风化程度和桩的嵌岩深度有关。

youdao

10. The rock-socketed cast-in-place piles are one of the common foundation treatment methods under highrise buildings.
钻孔嵌岩灌注桩已成为高层建筑较常用的基础形式之一。

youdao

11. The load transfer characteristics of rock-socketed pile are mainly decided by the shear behavior of rock-concrete interface.
嵌岩桩的荷载传递特性主要取决于混凝土—岩石界面的剪切特性。

youdao

12. The test results would be helpful to the large diameter rock-socketed cast-in-place piles in the soft bedrock under lateral loads.
试验得出结论对软质基岩横向承载力桩的研究和设计具有重要参考价值。

youdao

13. The large diameter cast-in-situ rock-socketed piles have been used more and more on the constructural design of high-rise buildings .
大直径嵌岩灌注桩在我国高层建筑设计中愈来愈多地被应用。

youdao

14. There are necklaces with high attack power, rings with armor and defense, trinkets with mana regeneration, socketed gems with crit rating.
既有高AP的项链,也有补充护甲的戒指和回蓝饰品,镶嵌的宝石还会补充爆击。

youdao

15. The paper also investigates the effect of rock-socketed depth, length-diameter ratio on the behavior of load transfer of rock-socketed piles.
探讨了桩的长径比、嵌岩深度对嵌岩桩的荷载传递性状的影响。

youdao

16. Based on a lot of international and our country's papers, research level of socketed-rock piles in Karst area has been proposed and discussed.
本文在参考大量的国内外文献资料的基础上,对岩溶地区嵌岩桩的研究现状进行归纳和总结。

youdao

17. Problem on the capacity of socketed bored piles with all manner of influence factor are analysed theoretically, on the basis of measured and test.
结合实测和试验资料,从理论上分析嵌岩灌注桩竖向承载力问题,及其各种影响因素。

youdao

18. This article discusses the relevant issues of Large-sized socketed spade coin, such as the situation of discovery, as well as the area and age of casting.
还对这类空首布的发现情况、铸行区域、铸行年代等相关问题进行讨论。

youdao

19. Theoretically the single pile vertical bearing capacity of rock-socketed pile is composed of the frictional resistance, the socketed force and the end-bearing force.
嵌岩桩的单桩竖向承载力理论上应由摩阻力、嵌固力、端承力组成。

youdao

20. According to the regularity and the comparison of the test results, the test method is feasible, from which the behavior of socketed piles in soft rock can be furth...
就试验结果的规律性、可比性判断,试验方法是可行的,可由此对软质岩中的嵌岩桩进行较为全面的认识和研究。

youdao

21. The horizontal capability and deformation of the large diameter rock-socketed piles were analyzed from the measured results of displacement and internal force of piles.
根据桩身变形、内力和地基抗力的测试结果分析了大直径嵌岩桩的水平承载特性、桩岩共同作用性状及套箱填砂对深水嵌岩桩水平承载力的影响。

youdao

22. The rock's modulus has some impact on the lateral carrying capacity of rock-socketed pile, increasing the modulus of rock can reduce the lateral deformation at the top of pile.
基岩弹性模量对嵌岩桩的水平承载力同样存在影响,增大基岩强度,桩顶水平位移变小。

youdao

23. On basis of the design of rock socketed pile, some problems are discussed, concerning the design method, design standard, design parameter and the standard on loading test of pile.
从嵌岩桩设计中遇到的实际问题出发,指出了现行设计规范存在的不足。

youdao

24. Piles socketed in soft rock were traditionally regarded as end bearing piles, and the loads transferred from superstructure were assumed in design to be shouldered totally by the piles.
软岩地基上的嵌岩桩基础一般都认为是端承桩,设计时假定上部结构荷载全部由桩来承受,而不考虑桩间土的承载力。

youdao

25. Through analyzing the calculation of vertical bearing capacity of rock-socketed pile given in technical code for building pile foundations, some unreasonable issues in the code were found.
从桩基规范中有关嵌岩桩竖向极限承载力的计算入手,分析其存在的问题和不合理之处。

youdao

26. This paper introduces the selection of wharf structural schemes and structural design characteristics of rock-socketed in-situ pile-based and truss-framed wharf in Zhaoqing New Port Project.
介绍在肇庆新港建设中,码头结构方案的选择,嵌岩灌注桩框架式码头结构设计的特。

youdao

27. This paper introduces the selection of wharf structural schemes and structural design characteristics of rock-socketed in-situ pile-based and truss-framed wharf in Zhaoqing New Port Project.
介绍在肇庆新港建设中,码头结构方案的选择,嵌岩灌注桩框架式码头结构设计的特。

youdao

百度翻译


有道翻译


单词首字母